![]() ![]() The fully digitised tank will enable interoperability with other combat vehicles in combined arms battalions while enabling multi-domain integration for data sharing across domains.ĭesigned to handle multi-domain warfare, the tank retains its ability to operate in coastal environments to support Future Commando Force of the Royal Marines. The tank will be manned by a crew of four including a commander, a gunner, a loader, and a driver. It will have a gross vehicle weight (GVW) of 66t, which is 1t more compared to its predecessor. The Challenger 3 MBT features a generic vehicle architecture and new digital crew stations. The new and improved main battle tank will be the British Army’s only 24-hour, all-weather, protected tank with accuracy, direct fire and anti-armour manoeuvre capabilities, playing a critical role in the UK’s ability to deliver hard power. Initial operating capability (IOC) is expected in 2027, while full operating capability is scheduled in 2030. ![]() ![]() The UK Ministry of Defence placed an £800m ($1.11bn) contract with RBSL for the conversion of 148 Challenger 2 tanks into Challenger 3 configuration, in May 2021. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |